Friday, March 4, 2011

Haunted Mansion Graveyard Construction and Hitchhiking Ghosts Update

Hello,
We got some new pics to show with you, they are of the new construction of the extended queue and graveyard at The Haunted Mansion.
 A view from the top.
 The graveyard come back together.



 First of 3 in a row of pics inside the closed area.
 Pic 2- You can see the new organ in the area.
 3rd pic- This is about half of the new queue area.
Last picture here shows the exit of the ride we believe there was a door under this black mesh. If you look there is cuts around the top of the mesh as if they are going to open this area up more.  If the rumors are true about new on ride photos added to the ride this could be where the screens would be to view your pictures.  We will have to see if any more happens here and see what happens when Disney shows off all the new changes to the ride.

As the week progressed we noticed changes to the new temporary Hitchhiking Ghosts. It was changes in the screen they were projected on. At first the screen was very tight and looked well placed. A On tues (3/1) the screens were very out of place and loose as if there was construction going on to the "mirrors" and of yesterday(3/3) the screens were placed back much better.
If you havent seen the Temp. change of the ghosts here it is.

1 comment:

  1. Wow,, 2012 I can't wait to see what they've done to the entire haunted Mansion.

    ReplyDelete